| Process: | Fuel preparation for cement kilns and power plants |
| Source: | Mixed hazardous wastes from various origins with caloric value
Hydrocarbon and solvent based sludge, food industry waste Full/empty metal drums and plastic containers Polluted wood/pallets, e.g. with painted surface Plastic packing waste and textiles, contaminated Catalyst and activated carbon, polluted Filters from vehicles, e.g. oil filters |
| Input Material: | Liquids and sludge with high and low viscosity
Non-reusable or packed hazardous waste |
| Homogenisation system: | Continuous and batch-wise turbulent mixers up to 30m³ volume |
| Peripheral equipment: | Receiving area, storage tanks, conveying/sieving/piping, control units |
| Technical availability: | In excess of 7.000 hours/year; 24 hours/day |
| Input restrictions: | Shreddable waste, massive concrete/steel parts rejected automatically |
| Output consistency: | Homogenised waste, free flowing or pumpable, pre-sieved |
| Throughput capacity design: | Up to 20 t/h, dosing according to incineration parameters possible |
| Optional process extensions: | Dosing equipment to furnace, nitrogen generation, metal separation |
| Design options: | To be built close to power plant or in separate fuel production facility |
Several case studies for many fields of applications are available in our download section.
To print this page in best quality, please download our printer friendly PDF.
To view PDF files we recommend the free Adobe Reader.